Our Crews update a school yard on Brown Street in Vacaville. We've completed underground utilities, parking lot preparation, and curbing. Paving is next.
Not only do we build, we also tear down. Our crew demolishes a house in St. Helena recently. Materials are sorted and hauled away to be recycled.
Our team moves dirt and completes grading with our D6K equipped with TOPCON 3D-GPS. The job includes building a roadway, grading preparation for pads to build a barn and house, and building a retaining wall.
Work continues in the Strag's Leap District of Napa where our crews install underground utilities at tunnel one and two for Realm Cellars. Included are fire lines; and, high pressure water lines for which our new fusion machine will be used to join the pipes. Work also continues in the preparation of new tunnel three, where our crews are finishing excavation in preparation for soil nails and wall construction.
VVEXC's Brandon Lopez operates one of our CAT D5 and D6 dozers, now equipped with 3D GPS capabilities. He is grading the site of a new gas station in Dixon. Nearby, our team begins work for underground utilities and further site prep.. Using Topcon's new technology, our GPS communicates with a satellite 120 times per second, which is 10 times faster than previous GPS equipment. The new GPS will be used to make precise grading adjustments. The GPS can be used by our dozers individually or to augment each other.
Our team is completing grading and underground utilities at the new Storage Pro on Leisuretown Rd. in Vacaville. Its the first job for our new CAT 320 Excavator!
Iron is raised for the construction of the Lodge at Glen Cove - our grading, underground and paving missions have been completed.
Our team relocated the intersection of Conn Creek Rd and Rt. 28 in Rutherford, making travel safer in Wine Country. Paving and striping has been completed. The finishing touches to the shoulder are underway in front of Caymus Winnery.
VVEXC begins site work to build a third wine cave at Realm Cellars in Napa.
Our crew members are completing grading, curbing, sidewalk and underground work at the new Hyatt Hotel in Vacaville.
Our Concrete Division team constructsforms for the entries to Winters Health Care, as the building rises from the lot we graded and prepared just months ago.
Very proud of the work our crews do!
Our concrete division crew at work inside and out and as our construction team prepares the site at Ardagh Group in Fairfield.
Work continues by our crew as concrete will be poured for a cold storage building in Phase III of the job. Also, demo of an old loading dock is completed.
Our team completes paving of a one-mile long driveway in scenic rural Winters.
Our Concrete Division crew finishes preparation for Monday's pour of the slab for a new building at Salad Cosmo.
Our crew completes water lines for the Lodge at Glen Cove.
Our concrete crew members strip forms from a cantilevered concrete wall that we recently poured. Meanwhile, other concrete division members complete forms and r...ebar wiring for a footing at the back side of the pad. On the periphery, our construction crew completes grading and compacting of soil for proper drainage. See more
Work continues as our team grades and begins installation of underground utilities Winters Health Care.
Our concrete crew continues work at Salad Cosmo, where crew members prepare forms for footings and a 7'6" retaining wall. We completed grading for the new pad, and will continue with installing underground utilities and paving for the new seed building at the growing company.
Our crew recently completed rerouting of a storm sewer line. We'll continue with grading and underground utilities in the days to come.
Our team recently began grading for hangar pads at Nut Tree Airport. We will be completing concrete work and pavement, as well as installing underground utilities
Our team began site prep of the future Winters Health Care recently. We'll be completing underground utilities and eventually paving at the new downtown facility.
Our team re-routes a storm line as work continues at Glen Cove. We're grading, installing underground utilities and will be paving.
Follow our crews from start to finish as we work from sunrise to sunset to install a 15' long x 9' wide x 24' deep precast pump station for agricultural use that is now complete and invisible to passersby.
Grading has begun at Salad Cosmo in Dixon where we will prepare for an 11,200 sq. ft. building addition. Our Concrete Division will pour 17,500 sq. feet of concrete for the foundation, pad, exterior pavement and sidewalks.
A parking lot expansion is near completion as our team finished grading, lighting, paving and landscaping of the parking lot.
It was all hands on deck as our team paved the parking lot of the new Starbucks after completing earthwork, underground utilities and final grading.
Our team trims for a second soil nail wall while earthwork and grading continues. We're removing rocks and 20,000 cu. yds. of dirt and gravel from the site of a future assisted living facility.
Our crews put the finishing touches after we paved 235,000 sq. ft. at the Camus Winery. Structures were raised to grade level for electrical boxes, valves, sewer and water service.
Our team has begun work on the new Mason Centre Office Complex in downtown Vacaville. Forms are in place for the elevator pit, and our concrete crew has installed rebar that will tie a retaining wall, sidewalk and building's footing together on the northeast side of the building.
There is a lot going on behind the scenes as Paul and Brandon meet with the superintendent and project manager of Blue Mountain Construction Services, General Contractor. Our team will do all earthwork, underground utilities, grading and paving at the site. Excavation and grading for a soil nail wall was recently completed, and a company is building the wall.
The new Starbucks will soon rise from the ground where our team has completed grading, tying in utilities, and has backfilled trenches. We will eventually grade and pave the parking lot.
Earth work begins as the VVEXC crews grade, cut, and prepare for access and underground utilities.
Site prep begins at the site of the new Starbucks on Nut Tree Parkway.
Our paving crew lays down the asphalt on the Corporate Yard Access Road off of Allison Drive.
Our concrete crew makes forms for curbing at the new Hotel. Underground work continues with water valves and connections being prepared for installations.
Our crews continue with the deep trench work to install an underground water lines for future use. Fill is compacted as the trench work is completed.
We pumped concrete into each tank at Caymus wines. The concrete hold-down system for the tanks is fed under the floors of the tanks. As the concrete pushes into place, runoff water flows from them in a drainage system built by our concrete division. The runoff water is manually removed from the premises.
Our crews dig a 22' deep trench, installing and covering a future sewer lateral at the distribution facility.
Work continues on the new four story Hyatt Hotel on Orange Drive.
Work continues at a steady pace on the site of the new four-story Hyatt Place hotel on Orange Drive in Vacaville. The slabs that the VVEXC Concrete Division poured already have the structure rising from them. We will complete all structural and site concrete. Our concrete crew was busy building forms for curbing and gutters on the site. Our demo crew was removing old concrete from the new entry way. We are installing sewers, storm drain and water lines, and will eventually complete all grading and paving on the site.
Our crews are now rebuilding the entrance to the distribution center at 700 Crocker Drive in Vacaville. VVEXC has removed and replaced 70,000 square feet of parking lot and poured 1300 cu. yds, of concrete at the site. We're installing storm drains, water lines, and sleeves for future use.
Our crews poured 700 cubic yards of concrete for footings using a boom pump at the Hyatt Place job site on Orange Drive in Vacaville. Our underground crew continued work on water, storm drain, sewer and electrical pipe and conduit installation. Next, we will pour 500 cubic yards of concrete for the pad of the new hotel.
Site preparation began for the new Chevron Station off of the Winters Exit of I-505. Stumps and roots were pulled by our crew as work got underway.
Our concrete crew sets up footings for the new four story building on Orange Drive in front of the Sunrise Center. The building is 84,000 square feet. The 21,000 aqua ft. footprint has 7,000 square feet of footing. Our crew installs bolts and secure forms.
Our concrete and excavation crew crew prepares for our installation of a Storm Tec System that will be under the parking area of the new Hyatt Hotel on Orange Dr. in Vacaville. The system hs holding tanks for excess surface water.
Vaca Valley Excavating Christmas Party
Grand babies sporting VVEXC!
Vaca Valley Excavating supporting 3 kids at the Dixon May Fair!
Larry Damitz Late Model Memorial To Pay $3000 to Win, $300 to Start A special $3,000 to win Late Model Division memorial race honoring Larry Damitz will take place on May 13 at Antioch Speedway. Damitz, an icon in California racing, passed away in January at the age of 87. Damitz’s 64-year career, begun at now defunct Vallejo Speedway, and included many wins and championships. He was most recently the 2016 Limited Late Model division champion at Antioch Speedway, his home ...track in recent years. Larry enjoyed racing at Antioch Speedway, says friend and Late Model driver Paul Guglielmoni. He had many friends there and loved racing side by side with them. The race purse was increased by promoter John Soares and augmented by sponsorship from Paul and Betty Guglielmoni’s Vaca Valley Excavating and Trucking and by the Matt Micheli family. The race will pay $300 to start and $3000 to win. Entry fee will be $50 for car and driver. Henner Truck Lines of Vacaville has put up $200 for a dash race. There will also be contingency prizes. The race is open to any and all late models in the West, adds Guglielmoni. We are hoping to build on this first race, and have more special shows for the Late Model Division in Larry’s honor. The race will be part of the Saturday night, May 13 program at Antioch Speedway. The speedway is located in the Contra Costa County Fairgrounds in Antioch, Calif. For further information and questions on the race, contact Paul Guglielmoni at Vaca Valley Excavating and Trucking 707-249-7049. See more
Our Workers Make the Company: VVEXC is not trucks and excavating equipment - it is a company made up of skilled dedicated workers. Here are a few pictures of our people at work in 2016.
We are close to home working on the site of the new storage facility next door to our headquarters on E. Monte Vista Ave.
Work continues on the site for Caymus Wines. Grading for pads, installation of underground drainage, and the completion of a massive retention pond have been completed in recent days.
The VVEXC crew completes underground, footings, and patio landings for a large housing complex.
On the Job - Our concrete crew completes curbing as we prepared the Sierra Vista School parking lot for paving, spreading base prior to black top.
Nearly two years and more than 2,000 yards of concrete later, the Vaca Valley Excavating concrete team is proud of its work at the stunning new Davis Estate Winery. Take a photo tour of majestic complex - easily spotted from the Silverado Trail: We paved the parking lots and driveways with blacktop, leading up to beautiful gravel-pave system we installed - enhancing the area around the buildings. Our cast-in-place walls hold the hillside around the lots and buildings.... A difficult undertaking with pleasing results was our installing a new concrete floor under a historic barn on site. The barn is now a relaxing setting for sips of wine amidst antique tractors and historic decor. Our concrete steps and landings twist to the upstairs kitchen in the main building. A wrap around deck features exterior decorative concrete. The spectacular view from the screened in front room of the building has suspended couches, with two-tone brown stained concrete that has been sealed for longevity. The front room looks down upon the Kugel Ball, floating upon a stream of water on top of a marble grape leave. We poured the surrounding concrete and made the circular pit. Opposite the Kugel ball is the chandelier adorned entrance to the wine caves. VVEXC poured the concrete floors within the massive caves leading to an exclusive temperature controlled, glass encased wine tasting room. Two prroduction rooms with drained concrete floors have tanks for white and red wine, each tank sitting on our concrete tank support walls. VVEXC is proud for completing all of the structural concrete for Davis Estate Winery, incuding the surrounding agricultural buildings.
Work is coming to near completition as our crews finished 1500' of frontage road widening last week at the Allied Fuel Deot in Napa. A tour of the grounds shows VVEXC's concrete and paving, along with decorative rocks we delivered and placed. The fuel depot will be for cars, trucks and electric vehicles. It will feature a Circle K store.
Vaca Valley bought two pigs at the auction for our employees! Bbq this summer!
Dixon Mayfair Livestock Auction!
Some of our concrete crew at the World of Concrete!
The 2016 racing season is underway! We're proud to welcome our newest team member - Bobby Hogge IV - who will be driving our new Victory Circle Late Model at the WILD WEST SHOOTOUT beginning this weekend at USA Speedway in Tucson. VVEXC will sponsor the cars driven by Paul Guglielmoni and Hogge IV at this major two-weekend event!
VVEXC makes concrete while the sun shines! Sunny days become fewer as winter has begun, but our crews were able to pour and finish 13,500 sq. ft. of concrete pavement today. We began filling planters with topsoil for landscaping, too, as the new Burger King off of I-505 at the Vaca Valley Parkway exit nears completion.
If we don't make it to your job it's because our equipment is busy
We're Up for the Holiday Season! It took a pretty tall lift to decorate the tree in front of VVEXC headquarters yesterday.
Our concrete work continues towards completion at the magnificant vineyard and winnery in Calistoga. Our crews finished the floors in the wine caves and into the circular tasting room Outside, extensive concrete work surrounds the structures of the complex, and encircles the kugel ball (boxed in plywood for protection). A Kugel ball is a sculpture feauring sphere supported by a thin film of water.
Popular Listings
JJ Swertfager at Premier Pools & Spas
1465 Tollhouse Rd 93611 Clovis, CA, US
+1 559-355-2471
Home improvement, Swimming pool & hot tub service
Senior Planning Services
402 E Carrillo, Suite C 93101 Santa Barbara, CA, US
+1 805-966-3312
Home improvement, Home healthcare service, Social service
Lorain Design Associates
527 G Street Suite A 95616 Davis, CA, US
+1 530-760-6625
Home improvement, Interior design studio