Mimiaga Engineering Group 07.11.2020

Did you see the most current video posted? https://www.youtube.com/watch?v=T6bjitbFB4g

Mimiaga Engineering Group 21.10.2020

Mimiaga Engineering Group provided Construction Management and Inspection services to the City of Ventura for their new membrane filtration plant project. The project provides the City an enhanced ability to produce clean drinking water. The project was the largest construction contract in the City’s long history.

Mimiaga Engineering Group 19.10.2020

Kern County Water Agency - Garnett Water Purification Plant The Agency has utilized Mimiaga Engineering Group construction services since 2008 in undertaking, overseeing, and closing out multiple technically challenging and process sensitive expansion projects at the treatment plant site. The overall expansion program designed to increase the Agency’s water purification and distribution peak capacity from 45 MGD to 90 MGD.

Mimiaga Engineering Group 04.10.2020

MEG Project: Los Osos Water Recycling Facility, dateline, April 2014 - February 2015 https://www.youtube.com/watch?v=Tyq3GNtLU1s

Mimiaga Engineering Group 20.09.2020

County of San Luis Obispo Los Osos Water Recycling Center Project underway...

Mimiaga Engineering Group 31.08.2020

Kern County Water Agency Garnett Water Purification Plant More on project: http://www.mimiagaengineeringgroup.com//kern-county-water/

Mimiaga Engineering Group 21.08.2020

The Haley - De La Vina Bridge project. Mimiaga Engineering Group provided Construction Management and Inspection services for the $5M replacement of the Haley/De La Vina Bridge originally constructed in 1915. The project including a temporary dam in Mission Creek and a temporary diversion pipe. The project included a significant environmental compliance effort. The project was located in a publicly sensitive area surrounded by businesses and vocal residents. The project required closure of the intersection for 18 months and a proactive public outreach effort. The project was completed successfully with the eventual appreciation from the neighborhood.

Mimiaga Engineering Group 15.08.2020

Here is our latest video uploaded recently on YouTube: https://www.youtube.com/watch?v=uu9dSXLBeaw

Mimiaga Engineering Group 27.07.2020

Check out the newest video uploaded to MEG's YouTube channel: https://www.youtube.com/watch?v=8I9ryyaqgVw

Mimiaga Engineering Group 14.07.2020

City of Santa Barbara Cater Water Treatment Plant.

Mimiaga Engineering Group 28.06.2020

City of Lompoc Waste Water Treatment Plant project.

Mimiaga Engineering Group 15.06.2020

Here's our latest video we just posted on our YouTube channel for the Los Osos Water Recycling Facility which features this project's progress from April through October of 2014. https://www.youtube.com/watch?v=gdM--u2VtTU