1. Home /
  2. Home improvement /
  3. Sollega Inc.

Category



General Information

Locality: San Francisco, California

Phone: +1 415-648-1299



Address: 2480 Mission St, Ste 107B 94110 San Francisco, CA, US

Website: www.Sollega.com/

Likes: 162

Reviews

Add review

Facebook Blog





Sollega Inc. 04.05.2022

Check it out - Sollega is featured in Solar Builder Magazine for the new UL3741 #smasolar https://www.mydigitalpublication.com/publication/

Sollega Inc. 01.05.2022

Streamlining Large-Scale Rooftop Installations with New UL 3741-Certified Systems with Mayfield Renewables, Sollega Inc and SMA. Register Here: https://lnkd.in/gV_6Grjh Description... In this edition of our Ask Mayfield Anything series, Blair Reynolds from SMA America and Lee Rothschild from Sollega join Ryan Mayfield to discuss how new UL 3741 certifications will drive cost and complexity out of large-scale rooftop PV installations while meeting NEC 690.12 rapid shutdown requirements. The group will describe equipment and design approaches that minimize or eliminate the need for module-level power electronics while meeting NEC 690.12(B)(2) requirements before opening the floor for audience questions.

Sollega Inc. 16.04.2022

Sollega and Bombard Rewable Energy are in the News! Nevada's Govenor Sisolak site walks the Catholic Charities of Southern Nevada's rooftop installation. https://youtu.be/SC69UVDSOEA

Sollega Inc. 04.04.2022

Project Spotlight: Big shout out to Energy Wise Services out of Albany, OR! This 112 kW array sits atop the Benton County Law Enforcement Building. A grant from Blue Sky thru Pacific Power helped them complete this project. Energy Wise Services used our ballasted FR510 solution with a 6 degree tilt and 8" inter- row spacing.

Sollega Inc. 06.11.2020

We made it on the 2019 Solar Builder Editor’s Choice Projects of the Year!

Sollega Inc. 18.10.2020

Hey everyone! We arrive next week at SPI 2019. Visit us at Booth# 5306 and we look forward to meeting you. Cheers.

Sollega Inc. 16.10.2020

Sollega is providing racking on the Hannah Solar Government Services project ! http://www.nacleanenergy.com/?action=article&id=29808

Sollega Inc. 01.10.2020

Sollega backs petition on pending solar module tariff 201case Ambassador Robert E. Lighthizer United States Trade Representative 600 17th St, NW... Washington, DC 20006 January 10, 2018 Dear Ambassador Lighthizer: We collectively are twenty-seven metal structure manufacturers that are part of the CSPV solar value chain. We strongly oppose the use of tariffs on solar modules in the current 201 case. Our companies and our domestic suppliers support more than 5,700 manufacturing jobs across America. The metal structures we produce literally hold solar energy systems together and are one of the three major manufactured products in a solar system: - Modules (convert light to electricity) - Advanced electronics (convert direct current (DC) to alternating current (AC) electricity; increase the power production from modules; provide measurements and controls) - Mounting structures (typically metal and physically support the solar power plant on the ground or a roof)

Sollega Inc. 16.09.2020

Sollega is providing racking for Chase Bank throughout California : Castro Valley, Claremont Village, Fremont, Glendora, Hesperia, Paramount, Santa Rosa, and Yucca Valley.

Sollega Inc. 13.09.2020

Sollega will receive the San Francisco Green Business award on February 7th, 2018.

Sollega Inc. 25.08.2020

Sollega was featured in January 2018 issue of CompositesWorld magazine on page 44. http://cw.epubxp.com/i/919214-jan-2018

Sollega Inc. 23.08.2020

Sollega is now Class A Fire rating UL1703 for type I, type II, and type III modules.

Sollega Inc. 17.08.2020

FastRack FR510 in Solar Builder Magazine May/June 2017

Sollega Inc. 08.08.2020

https://pv-magazine-usa.com//solar-survives-the-storms-in/

Sollega Inc. 26.07.2020

http://www.nacleanenergy.com//novdec_20/mobile/index.html

Sollega Inc. 19.07.2020

http://solarbuildermag.com//powering-puerto-rico-solar-in/

Sollega Inc. 30.06.2020

645 kW Array on VA Hospital in PR is 100% on and operational (running diesel generators to trick inverters) after 2 CAT 5 hurricanes!