Category



General Information

Locality: Modesto, California

Phone: +1 209-526-4214



Address: 1117 L St 95354 Modesto, CA, US

Website: www.mve.net

Likes: 71

Reviews

Add review

Facebook Blog





MVE, Inc. 01.11.2020

MVE is working on a new development in Riverbank, CA. We are updating the 1 lot parcel map for Crossroads West so that the future unit 1 site can be sold. We have prepared the force main extension plans on Roselle from Crawford to Patterson Road and are waiting for the electrical plans for the lift station upgrade to be submitted to the City. Remember to check back with us for more progress on this new development. #mveinc #engineering #surveying #constructionstaking #entitlement #newdevelopment #riverbank #modesto #california #crossroadswest

MVE, Inc. 30.10.2020

MVE is back on the Marysville Ring Levee project providing professional services. The U.S. Army Corps of Engineers is continuing repairs to the 7.5 mile long Marysville Ring Levee, which completely surrounds and protects the City of Marysville. The essential goal of this project has been to strengthen the levee and to protect it from the probability of water infiltration. To do this, soil, cement and bentonite clay is mixed with native soil to build a barrier or is directly packed into the trench itself. Stay tuned for more updates on this project. #mveinc #surveying #constructionstaking #marysville #levee #floodcontrol

MVE, Inc. 19.10.2020

Here’s an update on the Crystal Cove Conservancy’s (CCC) Capstone Restoration project. MVE is back on-site providing professional services. The infrastructure portion of the project was completed back in June and is now focusing on constructing the $1.7 million 650-foot elevated pathway and boardwalk. Contractors has been busy installing the balance of the utilities and is finishing the final grading of North Beach Road. The second phase of the restoration will begin very soon and will last for another three years until the project is fully restored and preserved with the final 17 cottages on the North Beach. #mveinc #surveying #constructionstaking #crystalcove #beach #newportcoast

MVE, Inc. 03.10.2020

MVE is providing services for the SR132 project in Stanislaus County. MVE is working on the new overcrossing at Rosemore and SR132 to improve regional and inter-regional circulation, relieving traffic congestion within the City of Modesto. Check back with us for more updates on this project. #mveinc #surveying #constructionstaking #SR132 #modesto #stanislauscounty #caltrans

MVE, Inc. 28.09.2020

MVE is providing a variety of services for a new affordable housing project in Downtown Los Angeles. The Firmin Court Apartments will consist of 66 affordable and Permanent Supportive Housing (PSH) homes for low income, homeless, chronically homeless families and provide on-site counseling services. Ground broke in 2019 and is now undergoing revitalization. #mveinc #surveying #constructionstaking #losangeles #downtownlosangeles #affordablehousing #newdevelopment

MVE, Inc. 21.09.2020

MVE is proud to be working with George Reed once again on the Stockton Metropolitan Airport. MVE is providing professional services on the Taxiway D - Phase 2 Mill and Overlay project. The purpose of this rehabilitation is to improve the airport’s airfield by increasing the length of the runway and improve instrument landing minimums. MVE will be on-site for the duration of the project. For updates on this project, remember to sign up for our monthly newsletter. You can do that by visiting our website at www.mve.net. #mveinc #surveying #constructionstaking #stocktonmetropolitanairport #stockton #airports

MVE, Inc. 03.09.2020

MVE is back on the LBA logistics center in San Jose. This logistic building is approximately 180,000 square feet on 5.8 acres and is strategically located along Interstate 880 at 1605 Industrial Ave. The state of the art industrial building will consist of 1,200 Amp Service with 4,000 Amp Pull Section, 50’x60’ column spacing, 28 dock doors, and up to 77 container/trailer stalls for large oversize material storage yard. This warehouse will be available by the second quarter of 2021. #mveinc #surveying #constructionstaking #sanjose #newdevelopment #industrial #warehouse

MVE, Inc. 26.08.2020

MVE is providing professional services for the Trails at Falling Leaf in Modesto. We’ve completed the Final Map of the resubdivision and the improvement plans to modify the service laterals. This project will only consist of 59 single family residential lots. Stay tuned for more updates on this development. #mveinc #engineering #civilengineering# thetrailsatfallingleaf #modesto #newhomes #newdevelopment #surveying #staking #constructionstaking

MVE, Inc. 24.08.2020

Our surveyors are back on Avena Bella providing a variety of services. Avena Bella II will consist of 61 units of family housing in two Mediterranean style buildings located on 2.2 acres. One building is a two-story walk-up with 16 units, and the other is a three-story elevator served building with 46 units. Apartments are a mix of 1-, 2- and 3-bedroom units clustered around a common recreation area and a tot-lot. This project is being constructed to meet LEED Gold Certifications. #mveinc #engineering #civilengineering #avenabella #seniorliving #turlock #eahhousing #afforadablehousing

MVE, Inc. 20.08.2020

Here’s an update on the Starbucks on Pelandale in Modesto, CA. Look for a grand opening in the next coming weeks! MVE would like to thank Costa Limited Partners for the opportunity. #mveinc #civilengineering #starbucks #medicaloffice #valleychildren #valleychildrenspelandalespecialtycarecenter #pelandale #modesto

MVE, Inc. 11.08.2020

MVE is back at the Sacramento International Airport working on the Taxiway Delta, Whiskey and Yankee rehabilitation project. This $5.3 million project is a reconstruction of runway 16R-34L. MVE will be on-site for the duration of the project. Stay tuned for more updates on this project. #mveinc #staking #constructionstaking #airport #transit #sacramentointernationalairport #sacramento

MVE, Inc. 26.07.2020

The Riego Creek Elementary School in Roseville, CA is complete! MVE is very proud to have been a part of JL Construction’s team. Riego was designed to reflect an updated layout by designing all of its community-use buildings such as the library, office and multi-purpose room at the front of the campus. The school will also feature flexible learning spaces, indoor and outdoor learning communities, a single point of entry, perimeter fencing and an adjoining public park. Feature...s included: 6 Kindergarten and TK classrooms with play structure, 3 learning community clusters organized by grades with outdoor learning space and shade structures, 28 classrooms plus associated restrooms, small group instruction rooms, a 4,000 SF multipurpose building with warming kitchen and stage, and an Administration building with associated offices. Photo credit: JL Construction #mveinc #surveying #constructionstaking #riegocreekelementaryschool #newschool #roseville #sacramento

MVE, Inc. 12.07.2020

Construction is underway for the Doragon @ Chinatown in Fresno and MVE is proud to be the engineer and surveyor for this development. The proposed project will be a high density, 4-story workforce mixed-use development with approximately 4,700 s.f. of ground floor retail space. Doragon will have (56) affordable workforce housing units, and (1) manager’s unit. The site consists of 0.60 acres of vacant land at 1101 F Street, Fresno, CA 93706. There will be (35) podium parking spaces located on the ground floor of the development. There will also be on-street parking available along F Street and Mariposa Street. Stay tuned for more updates on this project. #mveinc #civilengineering #surveying #constructionstaking #fresno #fresnohousingauthority #affordablehousing #doragonatchinatownfresno #chinatown #fresnochinatown