JIG Consultants 14.11.2020

Thank you to Ashley at Normans Radical Adventure for the fantastic masks for our team.

JIG Consultants 03.11.2020

BELL CANYON LIFT STATION REHABILITATION Trabuco Canyon Water District has experienced difficulty in operating the existing Bell Canyon Lift Station. Two of the four submersible pumps have failed to start, and the remaining two pumps provide intermittent but unreliable service. Further, the existing force main between the wet and dry wells is compromised and does not carry the full flow capacity of the lift station. Since this is a critical facility, the District has committed... to its immediate repair and/or rehabilitation. JIG is assisting the District on engineering design of the lift station rehabilitation. The engineering design will include the following tasks: 1. Develop and layout equipment to temporarily bypass the lift station. 2. Rehabilitate the wet well including interior relining, replacing the instruments for prime and backup level transducers, and replacing the mechanical equipment. 3. Replace the double-lift pumping equipment with a single submersible pump. 4. Replace the existing dry well including precast vault, mechanical equipment and flow meter. 5. Perform a transient analysis and recommend a size for the replacement surge tank. 6. Replace the existing chlorine feed system with a calcium nitrate chemical feed and storage system for odor control.

JIG Consultants 23.10.2020

CM Services for Large Potable Water Valve Replacement Project - Redondo Avenue and Kilroy Airport Way, Phase 1 JIG was awarded a professional services contract to perform construction management services for the Large Potable Water Valve Replacement Project - Redondo Avenue and Kilroy Airport Way, Phase 1. LBWD entrusted JIG's construction manager to oversee the quality of the Contractor's work and to ensure project execution coincides with the annual shutdown of the Groundwater Treatment Plant. JIG will take advantage of the lessons learned on this project and will apply it to the engineering design of the Phase 2 project (awarded in May 2019).

JIG Consultants 20.10.2020

JIG is looking forward to continuing our working relationship with our exceptional clients at the City of Corona. JIG has been awarded a 3 year On-Call Engineering and Professional Services contract with the City. Our focus and involvement will be for design of 1) potable and reclaimed water pump stations and storage facilities, 2) well equipping, 3) pressure regulating facilities, and 4) sewage lift stations. As always, we intend on meeting and exceeding the needs and expectations of our clients. We see this as an excellent opportunity to showcase our skills and knowledge on water and wastewater infrastructure design.

JIG Consultants 08.10.2020

Large Potable Water Valve Replacement Project - Redondo Avenue and Kilroy Airport Way, Phase 2 JIG is working with Long Beach Water Department to provide engineering design services for the Large Potable Water Valve Replacement Project Redondo Avenue and Kilroy Airport Way, Phase 2. This project is for replacement of four large potable water valves near LBWD’s Groundwater Treatment Plant, at the intersection of Redondo Avenue and Kilroy Airport Way. Our Project Manager recently served as the Resident Engineer on another Large Potable Water Valve Replacement Project at Bellflower Boulevard and Stearns Street. He will be taking the lead on design and completion of this project.

JIG Consultants 05.10.2020

West Haven Reservoirs Rehabilitation Project JIG is providing construction management and inspection services for this City of Garden Grove project. The West Haven Reservoirs are two 10 MG concrete reservoirs each with 20-inch outlet lines interconnected and serves as the source for the West Haven Booster Pump Station. As originally constructed, the outlet lines do not have valves therefore isolation of each reservoir cannot be easily accomplished. During construction, the we...st reservoir was isolated using a blind flange (installed by a diver). It was discovered that the existing outlet line for the west reservoir was compromised as water continued to leak coming from the east reservoir. To allow the Contractor to work on the west reservoir, divers installed a blind flange on the east reservoir outlet and an inflatable plug inserted into the west reservoir outlet. Once the west reservoir outlet was retrofitted, the inflatable plug was removed. Needless to say, this event was exciting and was caught on video by our inspector. Excellent team work.

JIG Consultants 17.09.2020

We are honored to welcome Nancy Heim to JIG Consultants as a new Project Engineer. She is a multifaceted engineer and is a perfect addition to our growing team. Nancy Heim has worked in the engineering industry for over 25 years. Ms. Heim has been involved in a wide range of civil and environmental engineering, including water reuse projects and assessments, field studies, and evaluation of water and wastewater related programs and procedures. She has extensive experience in ...technical writing and has authored and co-authored several technical manuals relating to water and wastewater issues. Her experience includes work with numerous cities and special districts as well as projects requiring close coordination with agencies such as railroad companies, Caltrans, US Army Corps of Engineers, and Department of Fish and Wildlife. Ms. Heim is an exceptional Project Engineer with a master’s degree in environmental engineering and a bachelor’s degree in civil engineering from the University of Southern California

JIG Consultants 02.09.2020

JIG Consultants is happy to be working with Garden Grove Sanitary District (GGSD) again on their On-Call Construction Inspection Services for Orangewood Avenue Sewer Improvements Project. Garden Grove Sanitary District plans to upsize approximately 850 feet of existing 10-inch VCP sewer to a 15-inch VCP sewer, on Orangewood Avenue to the Western Avenue intersection. Our project team is comprised of a highly qualified inspector and Construction Manager, together with GGSD we look forward to a successful project.

JIG Consultants 28.08.2020

JIG will be assisting IRWD with the preparation of the construction plans for the Replacement of 6-inch Domestic Water to MWRP Air Gap. Irvine Ranch Water District’s (IRWD) Michelson Water Recycling Plant receives domestic water from an existing 6-inch asbestos cement pipe located along the slope adjacent to Riparian View. In 2011, a 600-foot segment of the 6-inch asbestos cement pipe was replaced with polyvinyl chloride pipe (PVC) up to the existing air gap facilities. IRWD would like to replace the PVC segment of the pipeline and construct a new 6-inch PVC pipe along Riparian View to the subject air gap facilities.

JIG Consultants 23.08.2020

JIG is pleased to announce a new project with Orange County Water District (OCWD) for the Talbert Barrier Distribution Pipeline Upgrade. The Talbert Barrier Distribution Pipeline is part of OCWD’s seawater barrier system which prevents seawater from flowing inland in response to freshwater aquifer pumping by coastal cities. The project is for upgrades to the existing Talbert Barrier Distribution Pipeline to alleviate existing restrictions in the system. A hydraulic model will... be developed to confirm bottleneck areas with high velocities and develop alternatives for alleviating these conditions. Two potential bottleneck areas have been identified. The first area is an 800 foot pipe segment near the Ellis Avenue/Ward Street intersection, near the OCWD plant. The second area is a 135 foot pipe segment crossing under the Talbert Channel.

JIG Consultants 13.08.2020

New Project - Pipeline Alignment Study to City of Pomona Well No. P20 JIG Consultants is pleased to announce a new assignment with Three Valleys Municipal Water District for a Pipeline Alignment Study to City of Pomona No. P20. To increase sales of treated water to the City of Pomona, TVMWD is looking to construct a new pipeline from the Radcliffe Drive/Mills Avenue intersection to City of Pomona’s Well No.P20 / Reservoir No. 9 site. TVMWD water will potentially be used to supplement Pomona’s water supply by blending with high nitrate groundwater from Well No. P20. Well No. P20 discharges to Reservoir No. 9 but is currently inactive.

JIG Consultants 05.08.2020

Read about the groundbreaking ceremony for the North Bay Pump Station with Lake Arrowhead Community Services District. JIG Consultants is providing full-time construction inspection for this project. www.mountain-news.com//article_bc87b64e-9ef7-11e7-8d7d-c31

JIG Consultants 21.07.2020

JIG Consultants is now recognized by the Joint Utilities as a Minority Business Enterprise (MBE) for public utilities projects.