1. Home /
  2. Contractor /
  3. Grattan Construction

Category



General Information

Locality: Murrieta, California

Phone: +1 949-240-1222



Website: gratcon.com/

Likes: 213

Reviews

Add review

Facebook Blog





Grattan Construction 27.05.2021

Milgard Ultra window install in San Clemente. 20 windows and 3 sliders.

Grattan Construction 03.05.2021

We built this deck last week in 2 days for a Winery in San Clemente. They needed outdoor dining seating, so we built this deck for them. Just under 850 SF.

Grattan Construction 21.04.2021

Here is a remodel we just finished up in San Clemente. We took out the bearing walls to open it up with a built up LVL beam. We installed new Nana Wall doors across the front of the house. We installed a new linear fireplace along with a new kitchen and tile throughout the house. All new can lighting and ceiling fans.

Grattan Construction 24.12.2020

A door job we did Yesterday in San Clemente. Switched out front door to a new Dutch door and changed out slider to new Sliding panel slider. We will be back next week to start on the Hardi-Plank siding.

Grattan Construction 01.11.2020

Laguna Niguel remodel ready for concrete.

Grattan Construction 18.10.2020

Here is a kitchen and bath remodel we did in Bear Creek. We took out a fiberglass tub shower combo and built a new large walk in shower.

Grattan Construction 14.10.2020

Start of a new remodel project in Laguna Niguel.

Grattan Construction 26.09.2020

Here is a kitchen remodel we are just finishing up. Back splash and paint next week. We took out existing cabinets and soffit and raised ceiling for new full height cabinets. We added some LED under cabinet and puck lights.

Grattan Construction 11.09.2020

Start of a new remodel project in San Clemente. We are taking our some bearing wall to open room up for a new kitchen. We are also prepping opening for (6) new Nana Wall bifold glass doors.

Grattan Construction 02.09.2020

We are close to finishing up the Anaheim remodel. Cabinets and counter-tops went in over the weekend.

Grattan Construction 24.08.2020

After the rain delays we got our drywall delivered and stocked. 160 sheets upstairs and 20 downstairs, 12 foot sheets. Lath this week and drywall next week.

Grattan Construction 05.08.2020

After weeks of engineering delays we got our trusses late Monday. 1800 SF of trusses and plywood loaded on the second floor. Roof got stacked and mostly sheeted on Tuesday before we had to tarp for rain. Didn't have time to take any more pictures.

Grattan Construction 16.07.2020

Here is a deck job we did recently in Winchester. About 440 SF up on the hill with a spectacular view.

Grattan Construction 11.07.2020

This is an addition to care facility in Lake Elsinore. Adding 2 bedrooms off the rear. Lumber is being dropped tomorrow and framing later this week.

Grattan Construction 04.07.2020

1 day later and 450 studs later the walls are all stood. Plumb and line tomorrow and shear panel.

Grattan Construction 27.06.2020

Here Is a slab we did in Winchester for a new steel work shop for great client.

Grattan Construction 07.06.2020

Update on this project. We poured 36 yards of concrete for the pads and patio slab. Second story is joisted out and sheeted. We plated all the walls yesterday and they will be framed tomorrow. We are adding a little over 1700 SF to this home.