1. Home /
  2. Local business /
  3. Pro-Shore, LLC

Category



General Information

Locality: Union City, California



Address: 1636 Pacific Street 94587 Union City, CA, US

Website: www.pro-shore.com

Likes: 83

Reviews

Add review

Facebook Blog





Pro-Shore, LLC 09.07.2021

Pro-Shore, LLC High Bay Solution for the Pacific Structures Millbrae 5B Project with shoring heights up to 32' tall and slabs up to 30" thick. After Years of community input and numerous permitting hurtles, the Gateway at Millbrae Station development has started construction. Located next to San Francisco International Airport (SFO) and Bay Area Rapid Transits (BART) Millbrae Station, the 17-acre mixed-used development will feature a Marriott branded hotel, office space, res...idential and significant retail installments. The entire complex is slated for completion in 2025. The estimated $400-million Gateway Project is considered one of the largest transit-oriented developments in the Bay Area. It will feature 157,000 SQ. FT. of office space, 320 market rate apartments, 80 veteran preferred affordable housing units and 44,000 SQ. FT. of mixed use retail. #Pacificstructures #HighBayShoring #ProShoreSolutions

Pro-Shore, LLC 16.12.2020

Contractor: Berkeley Cement Project: AC Marriott hotel is Marin County’s first major hotel to be built in two decades. The 140-room hotel will be located in downtown on the corner of Fifth Avenue and B Street, in the county’s nexus.

Pro-Shore, LLC 27.11.2020

Contractor: Berkeley Cement Project: Redevelopment of Macy's Men's Store 120 Stockton San Francisco, CA

Pro-Shore, LLC 19.11.2020

We finished our Showroom displaying all of the products we manufacture. Pictures show all of Pro-Shore Products including OEM Products that we manufacture, sell, rent and store: Pro-Shore Pro-Deck... Pro-Span(Spanall 2-Piece Members--QB3 Style) Pro-Stair(Hi-Viz Telescoping/Collapsible Stair-Ladders) Pro-Grab(60 3 Rung Diamond Plate Slab-Grabbers) CAZ(Hi-Viz Controlled Access Zone Handrails) Ringlock Scaffolding Wall/Gang Forming (Double Channel Aluminum Walers + Aluminum Stringer/Joists) Frame Shoring--(20Kip) High Bay Shoring--(Up to 18’ Compatible with Pro-Shore/Pro-Deck) Column/Wall Bracing(Short and Long) Working Platforms(Aluminum Lengths 8’ to 20’) See more

Pro-Shore, LLC 11.11.2020

Project: Hilton Garden 111 E. Gish Street San Jose, CA General Contractor: Pro-Set Concrete Contractor: Sid Ceballos Construction Construction of a 96,000 Square Foot 5 story 150-room hotel with Approximately 160 at grade parking stalls. This project consists of modular pods flown to location by crane, on top of our Pro-Shore Modular Pro-Shore Decking System. Pro-Shore Posts utlized for this project are over 1000 each of the Pro-Shore #5 Steel Posts set at for 16' - 17' decks.