1. Home /
  2. Gift shop /
  3. Ocean Heir

Category



General Information

Locality: Cambria, California

Phone: +1 805-909-9022



Address: 2024 Main St 93428 Cambria, CA, US

Website: oceanheirestatecompany.com

Likes: 534

Reviews

Add review

Facebook Blog





Ocean Heir 12.07.2021

Hats off to mom! Stop by Ocean Heir on Mother's Day for 15% off any hat in the shop!

Ocean Heir 25.06.2021

Who doesn’t love a great #ghoststory

Ocean Heir 17.06.2021

Highway 1 at Rat Creek to Open Today! The construction phases for this emergency project have been ordered in such a way as to allow for the rapid reopening of the road even as remaining construction tasks are being completed. Additional construction activities which will be accomplished over the next few months include installation of permanent guardrail (K-rail now in place), construction of headwalls at the culvert inlets, final grading features, and placement of erosion c...ontrol measures on both sides of the roadway. One component yet to be started is a tunneling operation to install a 10 ft. diameter, one-inch thick steel pipe culvert which will pass from the canyon, through the fill below the roadway, and outlet to the ocean. This key piece of infrastructure will substantially improve water flow capacity during future storm events. It will be augmented by a 5 ft. diameter culvert and two 24 in. culverts which have already been installed closer to the grade of the highway. The redundancy of the drainage infrastructure is designed to make the highway more resilient to extreme weather conditions which will allow for safe travel. Crews have worked on site since immediately after the January 28 washout, seven days a week during daylight hours, and their consistent efforts have made it possible to reopen Highway 1 at Rat Creek in only 86 days. In addition, favorable weather, which has dominated the area since the road washed out, has also been a contributing factor in the rapid completion of the construction activities to this point. Approximately 70,000 cubic yards of debris material was removed from the canyon while a repair design strategy was being evaluated. Once an enhanced fill strategy was identified in late February, 45,000 cubic yards of fill dirt, capable of being compacted to support the roadway above, was introduced into the canyon. As crews complete the remaining construction work over the next few months, intermittent traffic control at this location may cause delays for motorists of up to 10 minutes. Message and directional signs will be in place to alert motorists when one way reversing traffic control is required. Notwithstanding this intermittent traffic control, Highway 1 at Rat Creek will fully reopen on Friday April 23 at noon; welcome news indeed for residents, recreationalists, business owners, and those who move goods through this region.

Ocean Heir 10.06.2021

The perfect outfit to go under this great straw hat.

Ocean Heir 01.06.2021

Enjoy the lovely Spring weather with a perky little sundress, keep this hip denim jacket handy, just in case that chill creeps back in the air.