Gerald Desmond Bridge Replacement Project
Category
General Information
Locality: Long Beach, California
Phone: +1 562-485-2780
Address: 11 Golden Shore, Suite 110 90802 Long Beach, CA, US
Website: www.newgdbridge.com
Likes: 4365
Reviews
Facebook Blog
Check out that fiery sunset captured with the bridge towering over Long Beach! Southern California’s postcard perfect bridge. Thanks to Instagram user scottjprusko for today’s #FanPhotoFeature.
The new bridge is 205 feet above the channel, and able to accommodate larger ships50 feet higher than the Gerald Desmond Bridge. #TriviaTuesday
A fine art exhibit documenting the Bridge Project is opening at Long Beach Creative Group Gallery. Find details in our Weekly Update: https://bit.ly/3w2sc9z. View the pieces online: https://bit.ly/3sqmsVa, and check out stories of the artists featured: https://bit.ly/3rrd0iX.
We’ve shared many stories of the #GDBRPCrew during our #MeetTheCrewMonday series and want to recognize their dedication over the past years to creating #LongBeach’s new icon. (Photo from 2016)
Check out the Bridge Project’s Weekly Update for the latest traffic and waterway detours for March 26 April 1 here: https://bit.ly/3w2sc9z. #LongBeach #SanPedro #TrafficAlert
The Bridge Project's architectural lights will illuminate the bridge's cable-stays and towers in different colors. The lights have been installed and will be tested over three nights this week: Tuesday, Thursday and Friday. Read more here: https://bit.ly/3lcy8Hy
Check out the Bridge Project’s Weekly Update for the latest traffic and waterway detours for November 6 12 here: https://bit.ly/3lcy8Hy. #LongBeach #SanPedro #TrafficAlert
Preparing the site required relocating 10 miles of utility lineswater, natural gas, sewer, storm drains & electrical wiring. Liquid nitrogen was injected into the soil to freeze the land to prevent water from seeping into trenches dug to uncover the lines. #TBT
Check out this beautiful painting of the two bridges in the final stages of construction from Instagram user liztalbotart. Thank you for this beautiful piece! #FanPhotoFeature
Seismic dampers are installed on and below (pictured) the road deck to protect the towers and main span, and are just one of several seismic features to protect the new bridge elements during an earthquake to help ensure the roadway remains open. #TriviaTuesday
In the future, the Mark Bixby Memorial Bicycle Pedestrian Path will be a great addition to Long Beach’s network of bicycle routes. Although the new bridge opened to vehicle traffic on Oct. 2, the Bixby Path is still under construction. Read more: https://bit.ly/31Xz0YF
Check out the Bridge Project’s Weekly Update for the latest traffic and waterway detours for October 30 November 5 here: https://bit.ly/3kK9EoJ. #LongBeach #SanPedro #TrafficAlert
Today’s #TBT comes to us from September 2014, as the new bridge’s foundations began construction. More than 350 concrete piles, some reaching more than 17 stories underground, support the new bridge.
That’s one majestic bridge! Thanks to Instagram user p.e.s.t.o for this shot of the new bridge towering above the Port of Long Beach. We love seeing your photos. Tag us for a chance to be featured, and please don’t take pictures while driving. #FanPhotoFeature
The new bridge has 80 cables supporting the road deck. The new bridge is a cable-stayed design, with cables directly connected from the towers to the road deck (unlike a suspension bridge, which has cables draped over towers). #TriviaTuesday
We've shared aerial drone footage of the Bridge Project throughout construction, but somehow today's looks so much better now that traffic is traveling over the new bridge. Check out views of the towers, cables, dampers, an empty Gerald Desmond Bridge, and the city of #LongBeach.
Check out this view of the opening ceremony of the Gerald Desmond Bridge in 1968. Times have changed but the new bridge remains a vital link in global cargo movement. #TBT
Popular Listings
Air Force Recruiting El Centro/Yuma
+1 760-791-5574
Business service, Public & government service, Employment agency, Recruiter, Public figure
Live Scan Fingerprinting
201 E Center St 92805 Anaheim, CA, US
+1 714-635-6600
Local service, Public & government service
Alliance for Jobs and Sustainable Growth PAC
150 Post St, Ste 405 94108 San Francisco, CA, US
Government organisation, Public & government service, Political organisation