Blue Line Biogenic CNG Facility 11.11.2020

The Biogenic CNG Facility receiving bay early this morning. Steaming hot organics. Thank you for feeding your green cart! #anaerobicdigestion #foodtofuel

Blue Line Biogenic CNG Facility 08.11.2020

We just installed a Scott Turbo Separator to remove contaminates from the organics we collect on our routes. The end product produces a virtually contaminate free feedstock which is used in our Anaerobic Digestion process.

Blue Line Biogenic CNG Facility 19.10.2020

KPIX Channel 5 feature on the Blue Line Biogenic CNG Facility. Aired March 30, 2017. https://www.youtube.com/watch?v=1Nt9Pnn0eD8

Blue Line Biogenic CNG Facility 08.10.2020

https://www.biocycle.net//biogas-fleet-fuel-south-san-fra/

Blue Line Biogenic CNG Facility 05.10.2020

We are honored to be a recipient of a 2015 Governor's Environmental and Economic Leadership Award. #GEELA

Blue Line Biogenic CNG Facility 21.09.2020

A couple of our recent awards!

Blue Line Biogenic CNG Facility 03.09.2020

http://www.recyclingtoday.com/zero-waste-energy-blue-line-t

Blue Line Biogenic CNG Facility 22.08.2020

http://www.smdailyjournal.com//food-scr/1776425136478.html

Blue Line Biogenic CNG Facility 18.08.2020

Hot Commissioning is under way and we are producing gas!

Blue Line Biogenic CNG Facility 03.08.2020

https://t.e2ma.net/webvi//9702149ed27b9a9ebd937cc2e5da45c8

Blue Line Biogenic CNG Facility 14.07.2020

Off loading the first 6,500 gallons of percolate that will consume the food waste and green waste to create the methane which will ultimately be converted into BioCNG to fuel 8 to 10 collection trucks per day. We will load the underground tanks with 30,000 gallons of 130 degree percolate before the night is over.

Blue Line Biogenic CNG Facility 07.07.2020

Ready to start making gas!